Medical Equipment
Rajmed Solutions — EST. 2024
Medical Equipment
Offering you a complete choice of products which include British Standard Medical Gas Outlet, Medical Gas Zonal Valve Box, Isolation Valve With Fitting and Medical Gas Pipeline Systems.

1. British Standard Medical Gas Outlet
Minimum Order Quantity: 10 Piece
| Body Material | Stainless Steel |
| Gas Type | Medical Air |
| Outlet Standard | British Standard(BS) |
| Mounting Type | Panel Mounting |
| Usage | For Medical |
Safety Precautions
- Connect equipment correctly: Connect medical gas equipment to the outlet using the correct connection equipment (e.g., adaptors, connectors).
- Turn on valve: Turn on the valve to supply medical gas to the equipment.
- Check gas flow: Check that the gas flow is correct and within the required parameters.
- Monitor equipment: Monitor the medical gas equipment to ensure it is functioning correctly.
2. Medical GasZonal Valve Box
Minimum Order Quantity: 10 Piece
| Material | Stainless Steel |
| Finish | Color Coated |
| Usage | For Medical |
| Shape | Rectangular |
| Color | White |
Safety Precautions
- Turn on the main valve: Turn on the main valve to supply medical gases to the valve box.
- Select the zone: Select the zone or area to which you want to supply medical gases.
- Turn on the zone valve: Turn on the zone valve to supply medical gases to the selected zone.
- Monitor pressure gauges: Monitor the pressure gauges to ensure the medical gases are at the correct pressure.


3. IsolationValve With Fitting
Minimum Order Quantity: 10 Piece
| Valve Size | 10 mm |
| Material | Brass |
| Pressure | 16 Bar |
| Finish | Color Coated |
| Usage | Used to isolate a pressure gauge from a process system |
Safety Precautions
- Close the isolation valve: Before starting maintenance or calibration work on the pressure gauge, close the isolation valve to shut off the process fluid supply.
- Verify isolation: Verify that the isolation valve is fully closed and the pressure gauge is isolated from the process system.
- Perform maintenance or calibration: Perform the necessary maintenance, calibration, or replacement work on the pressure gauge.
- Reopen the isolation valve: Once the work is complete, reopen the isolation valve to restore the process fluid supply to the pressure gauge.
4. Medical GasPipeline Systems
Minimum Order Quantity: 10 Piece
| Material | Brass |
| Usage | For Medical |
| Finish | Color Coated |
| Voltage | 240V |
| Frequency | 55Hz |
Safety Precautions
- Follow manufacturer instructions: Follow the manufacturer’s instructions for installation, operation, and maintenance.
- Regularly inspect: Regularly inspect the manifold and piping for signs of damage, wear, or corrosion.
- Use proper safety equipment: Use proper safety equipment, such as gloves and safety glasses, when handling medical gases.
- Ensure proper ventilation: Ensure proper ventilation in areas where medical gases are in use.

